LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Fresh call to scrap Chelker turbines plan 

Credit:  By Amanda Greaves, Ilkley Gazette, www.ilkleygazette.co.uk 28 July 2011 ~~

Water company bosses should scrap plans for 80-metre tall wind turbines at the Chelker Reservoir after continuing strong opposition at another public consultation, says a group against the scheme.

Parishioners Against Chelker Turbines (PACT) chairman, Peter Rigby, said 90 per cent of people polled at a public consultation meeting in Draughton last Wednesday were against the latest scheme being drawn up for Kelda Water Services.

He is now calling on the firm – a Yorkshire Water sister company – to give up on the scheme.

KWS recently withdrew a planning application for three turbines to replace the four ageing turbines already at the scenic spot, at least two of which are permanently out of action.

The company is now carrying out a public consultation on proposals for just two turbines – but has not reduced the height.

In a PACT statement, Mr Rigby said: “Kelda gave people very little notice and the weather was poor, so we were grateful that so many came to tell the developers just what they thought.

“Ninety per cent told us they were against the scheme. The results of our earlier poll at last week’s Addingham event were much the same. It’s time Kelda got the message and scrapped their plans.”

A long time Chelker resident, Vanessa Leigh, whose home is the closest to the proposed western turbine, likened the local opposition to KWS’ scheme to the battle between David and Goliath.

KWS wants to use the turbines to power two nearby water pumping stations, which pump water from the Chelker Reeservoir to homes in the Skipton area and Wharfedale. The company says the wind-generated power will go part of the way towards meeting the large energy bill for the site.

Source:  By Amanda Greaves, Ilkley Gazette, www.ilkleygazette.co.uk 28 July 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon