LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

2008 date for coastal wind farm 

Some 55 metal wind turbines visible from the local coastline could be in place by 2008 if Oriel Windfarm’s proposal to develop an energy generating facility get the go-ahead.

The turbines will be visible from 45 separate locations along the coastline.

The tubular wind turbines will be 86m, made of steel and generally painted light grey. Their finish is matt, to reduce reflected light, and the developers claim they “˜they will only appear as small pins on a corner of the horizon on a clear day’.

The environmental impact of the e55 million project on towns as far west as Ardee will also be studied over the coming months.

Those who believe windfarms are noisy are wrong say its developers Oriel Windfarm.

“˜It is possible to stand underneath a turbine and hold a conversation without having to raise your voice. As wind speed rises, the noise of the wind masks the noise made by wind turbines. The evolution of wind farm technology over the past decade has rendered mechanical noise from turbines almost undetectable with the main sound being the aerodynamic swoosh of the blades passing the tower. There are strict guidelines on wind turbines and noise emissions to ensure the protection of residential amenity.’

The licence area for the windfarm is located north east of Clogherhead and 20 kms north east of Drogheda.

The wind farm will be developed in five phases of 11 turbines each.

Oriel’s plans for the offshore wind farm are still at the developmental stage. The company has a specialist team researching all aspects of the project with the objective of applying for permission to build the off shore wind farm in 2007.

These studies include an environmental impact assessment, soil and terrain sampling, service and support requirements, and connection to the electricity grids in Northern Ireland and the Republic.

When the 55 turbines are completed the wind farm will be capable of supplying power to up to 200,000 homes.

By Christine Doherty

unison.ie/

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky