LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Perth wind turbine plan draws criticism from nature body 

Credit:  NatureScot believes Aviva has picked "a poor location" to erect a 77 metre high turbine to power its office buildings at Pitheavlis | By Paul Cargill | Daily Record | 6 May 2022 | www.dailyrecord.co.uk ~~

Scotland’s nature agency is standing in the way of insurance giant Aviva gaining consent to erect a 77 metre high wind turbine in Perth on its second attempt.

Scottish Ministers overruled local councillors who granted Aviva permission to position a turbine at Pitheavlis on appeal two years ago after Historic Environment Scotland (HES) said the development would have “a significant adverse impact” on the setting of the company’s A-listed office buildings.

The insurer sent Perth and Kinross Council a revised planning application earlier this year seeking permission to erect the turbine on land 200 metres away from the listed buildings on land east of a former sports centre to avoid another clash with HES over the proposal.

The company told PKC in a design statement completed in February this year that despite having already made “significant investment” at Pitheavlis to produce all its electricity from renewable technologies such as solar panels, only 27 per cent of its current demand is met by these energy sources.

The statement went on: “The installation of a single 1MW wind turbine could potentially provide enough electricity to power over 75 per cent of Aviva’s site, taking the site to net zero in terms of electricity.

“Wind energy is the only technology that can provide the level of renewable energy generation required to reach net zero on the Perth site.”

The statement added: “The relocation of the turbine will substantially reduce the extent to which the wind turbine will ‘fracture the skyline’ over the main building.

“The only location from which the wind turbine will be visible over the main building will be in glimpsed oblique views from the north west.”

HES has since advised PKC it has decided not to object to Aviva’s second planning application being granted consent after reviewing the updated information.

However NatureScot has now told PKC it considers the company’s latest chosen location for the proposed turbine a “poor” one that would “likely” lead it to become “an uncharacteristic and prominent feature” on the landscape resulting in “a major change to views in and across the Perth area”.

The government agency said in its comments on the proposal: “It would be a new, large-scale element in important views towards and across the city and moving blades would exacerbate this effect.

“We advise that it would be a distinctive feature that would draw the viewer’s eye and it would likely become a major orientating feature in the area.

“This includes important parts of the city which are used for recreation where the scenic qualities of the city are enjoyed such as the North and South Inches.

“While we appreciate trees and buildings may restrict views from some locations, the development will be readily seen and appear in a prominent location on the skyline drawing the eye and detracting from and impacting upon the attractive townscape of Perth city.

“The prominence of the turbine and the scale of the impacts are largely down to the proposed location being elevated above much of the city.

“Our advice is this is a poor location for a wind turbine and alternative locations on the edge of the city, at lower elevations, would substantially mitigate many of these landscape and visual impacts.”

The application is now currently awaiting a decision from PKC planners.

Source:  NatureScot believes Aviva has picked "a poor location" to erect a 77 metre high turbine to power its office buildings at Pitheavlis | By Paul Cargill | Daily Record | 6 May 2022 | www.dailyrecord.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky