Penderfyniad ar yr Apêl | Appeal Decision: Pentre Tump 

Author:  | Aesthetics, Tourism, Wales

Site address: Land at Pentre Tump, South-East of Llanfihangel-Nant-Melan, New Radnor, Powys

  • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to grant planning permission.
  • The appeal is made by REG Windpower Limited against the decision of Powys County Council.
  • The application Ref P/2012/0779, dated 29 June 2012, was refused by notice dated 13 December 2012.
  • The development proposed is construction of 3 wind turbine generators with a maximum height to blade tip of 103.5m above ground level, and infrastructure comprising vehicle access tracks, hardstandings, construction compound, upgraded highway access, electrical switchgear building and compound, cables and ancillary development.

Decision

The appeal is dismissed.

Main Issues

The main issues in this appeal concern the effects of the proposed development on the character and appearance of the landscape and its consequences in these terms for amenity, and the balance to be struck between the effects of the proposal in these terms and the benefits of the scheme in delivering energy from a low-carbon renewable source, having regard to the thrust of relevant local and national policies concerning onshore wind energy developments.

Landscape and visual effects

The 3 turbines would be positioned linearly along a 1km section of a ridge to the south of the A44 passing through the valley of the Summergil Brook between New Radnor and Llanfihangel-Nant-Melan before it climbs westwards past Forest Inn and proceeds towards Llandegley. The ridge varies in elevation from about 480m at its western end (Bryn-y-maen) to about 425m above New Radnor, generally keeping above the 400m contour along its length. The turbines would be located within enclosed upland pasture on top of the ridge at an elevation of about 420m, with the valley floor at about 280m. To the south of this part of the ridge, across slightly lower ground, hills rise to about 530m (Caety Traylow and Llanfihangel Hill).

Access to the site of the turbines would be from the A44 via Lower House Farm. The existing farm access at this point would be upgraded to accommodate large vehicle turning movements. Two small rudimentary agricultural buildings would be removed to facilitate access. A 5m wide stone track would be formed, substantially following the line of an existing bridleway up the hillside but in its middle section taking a new course across and up the slope. The development would also include individual turbine service tracks and hardstandings, temporary construction compound, and electrical switchgear building and compound, all within the confines of the enclosed upland pasture close to the turbine positions.

The landscape and visual effects of the proposed development have been the subject of detailed analysis and assessment via the ES, including the supplementary environmental information (SEI) prepared in August 2013. The local landscape character appraisal and wind energy capacity / sensitivity analysis in the SEI builds on the earlier LANDMAP aspect area analysis in Chapter 7 of the ES and seeks to provide a more detailed assessment of the sensitivity of the local landscape and its capacity to accept a wind turbine development, based on a 5km radius study area and focussing on the Powys County Council Landscape Character Assessment which is informed by and derived from the LANDMAP study.

However, whilst I accept that the methodology followed in this assessment reflects currently accepted professional guidelines, I consider that analysis of local landscape character and wind energy capacity / sensitivity on the basis of the principal overall characteristics of landscape character area LCA R3 Aberedw Uplands only partly reflects the particular landscape characteristics of the appeal site and its environs. LCA R3 is predominantly characterised as of large scale with broad hilltops, often merging to create an upland plateau landform, with simple landcover. Whilst the proposed turbines would undoubtedly be perceived primarily within this context from surrounding upland vantage points, the turbines and the proposed access track from the A44 would equally significantly be experienced in the context of the strongly- defined Summergil Brook valley and the enclosing Pentre Tump ridgeline, which has very different characteristics to the simpler, broader-scale, unenclosed upland landscape.

Although the landscape on the south side of the A44 carries no national or local landscape protection designation, it is nonetheless evaluated as of high scenic quality. Seen from Llanfihangel-Nant-Melan and the A44 for a kilometre or so to the east of the hamlet, the turbines would be perceived as very large structures, frequently with blades in rotation, occupying a considerable extent of the skyline little more than a kilometre away. Whilst the actual turbine positions would be set back somewhat from the crest of the skyline, and the extent of visibility of each turbine would vary from place to place according to intervening vegetation, structures and landform, I consider that overall the turbines would constitute a highly prominent, almost dominant, element in the landscape. In addition, for eastbound users of the A44 for a further 1.5km or so west of Llanfihangel-Nant-Melan, including those halting at lay-bys at The Van and Forest Inn, the turbines would feature as prominent features attracting the eye on the Pentre Tump skyline ahead.

I recognise that road travellers are generally classified as visual receptors of low sensitivity. However, the A44 is a principal leisure route into Wales, recognised as having scenic value. Given this, and the volume of use as a principal route, I regard the effects of the development as perceived by users of the A44 as significant. This stretch of the A44 west of New Radnor through the Summergil Brook valley and past Forest Inn conveys a sense of drama, whether travelling west or east, with the steep valley sides enclosing the valley floor and extending the upland agrarian landform towards an untrammelled skyline and the upland heights beyond. The valley also contains the hamlet of Llanfihangel-Nant-Melan, which nestles on its floor close under the Pentre Tump ridgeline. The proposed turbines would constitute a highly prominent feature on the immediate skyline for users of the A44 and for residents of and those visiting Llanfihangel-Nant-Melan. I consider that they would be an unduly dominant and distracting addition to the landscape setting of the Summergil Brook valley and the hamlet, due to their scale, prominent skyline position and moving blades. They would significantly harm the present landscape attributes of the locality.

In addition, the proposed access track from the A44 onto the Pentre Tump ridge would be a significant new feature in the landscape. Whilst a number of existing tracks climb the valley slopes, including the access track from Lower House Farm to small masts part way up the hillside, the scale and engineered profile of the turbines access track, with its wider running surface to accommodate the large vehicles involved and elements of cutting and building-out from the hillside, would result in a correspondingly greater physical and visual impact upon the landscape. Although the constructional details and landscaping mitigation proposed would assist in reducing the impacts, I nevertheless conclude that the access track element of the development scheme would comprise a somewhat discordant new element across the largely unspoilt valley side, parts of which would be obvious from the A44 and which would be very evident to recreational users of the bridleways in this location.

The second main area of landscape and visual impact relates to the effect of the turbines on the character and the use and enjoyment of the upland areas in the locality. The site of the turbines is on an upland ridge fringing the elevated block of LCA R3 Aberedw Uplands. This is a large-scale landscape, characterised by hills merging to form an extensive plateau, broad sweeps of sky and a generally unenclosed and undefined landcover pattern. However, notwithstanding that the area has no national or local landscape designation, its scenic quality is evaluated as high. Although the elevation of the Pentre Tump Ridge, on which the turbines would stand, is exceeded by hills to the south and north, the site is prominently located in a range of views and vistas from different directions, with many upland recreational routes leading in the direction of, or having views of, the site. These routes include a number of publicised routes and routes used for pony trekking tours, including overnight stays at Llanfihangel-Nant-Melan.

Indeed, the evidence indicates a concentrated network of recreational routes onto and along the ridge on which the turbines would be located, and over the higher ground of Llanfihangel Hill / Caety Traylow to the south and Bryn y Maen to the west. For users of these routes the proposed turbines would be a persistent presence in the landscape for distances of up to 2.5km from the site, giving rise to a spectrum of effect in the landscape ranging from prominent, through dominant, to overpowering in the immediate vicinity of the turbines. To the north are upland recreational routes descending from the high ground of Radnor Forest, from where the turbines would appear as noticeable elements distracting from the extensive and otherwise unencumbered vista to the far horizon of Hay Bluff and the Black Mountains. Overall, I consider that the extent to which the proposed turbines would impose themselves upon the landscape experienced and perceived by users of the upland recreational routes, particularly the network of bridleways used by horse riders, represents a significant adverse effect.

The turbines would also be a noticeable skyline feature, at a range of about 5km, in the fine vista of the Radnorshire uplands obtained looking westwards from the Offas Dyke Path National Trail over Hergest Ridge. Although Natural England has not objected on grounds of impact on the Offa’s Dyke Path National Trail, and I accept that various man-made structures including other turbines may be visible from various parts of the trail, in this particular landscape context I consider that the turbines would detract from the current fine and untrammelled view of Welsh uplands afforded from the route over Hergest Ridge.

I consider that, notwithstanding the broad landscape characteristics pointed to by the Appellant in support of the case that the host landscape has the capacity to accommodate the proposed scheme, the qualities of simple, unencumbered upland landform, space and relative tranquillity would be significantly interrupted by the proposed turbines. Given the extensive network of recreational routes, both close to and further away, from which the turbines would be perceived as prominent, dominant or even overwhelming, and the level of sensitivity which users of these routes will have to the character of their surroundings, I conclude that the proposed development would have a seriously adverse effect on the character and appearance of this upland landscape and the amenity of its users.

A further matter arising from the relationship of the proposed development to rights of way is the development’s effect on the use and enjoyment of the public rights of way network. In addition to the effect of the turbines on the appreciation of the upland landscape from the various recreational routes referred to above, the proposed development would have impacts on usage of bridleways in the immediate vicinity of the development. Existing bridleways pass 145m from the indicated location of turbine T3 (route 1264) and 150m from the indicated location of turbine T1 (route 1262). Annex C of TAN 8 refers to a British Horse Society (BHS) suggestion of a 200m exclusion zone either side of bridleways in order to avoid turbines frightening horses. TAN 8 notes that this is not a statutory requirement and the circumstances pertaining at any particular site should be taken into account. At the hearing I was informed that the current BHS guidance recommendation is for an exclusion distance of three times the turbine height (in this case, 310m), although TAN 8 remains as before.

Given the evidence suggesting regular usage of bridleway routes 1262 and 1264 past the proposed turbine locations I consider that this is a significant issue. The submitted unilateral undertaking makes provision for new lengths of permissive bridleway to be created, allowing riders to divert from the existing bridleways so that it would not be necessary to ride closer than 252m from turbine T3 and 275m from turbine T1. Whilst I consider that the resulting separation distances if using these routes as an alternative would be likely to be broadly acceptable, it would nonetheless entail an artificial and somewhat convoluted diversion away from the historically used route past Llanwentre Pool and then along the natural line east of Foice Farm around Pentre Tump. Such disruption would dilute the connection between receptor and the historical line of the bridleway route, which is integral to the experience and enjoyment of the landscape. Even though the proposed permissive bridleway measures would create a feasible alternative, I consider that the enforced diversion, for those riders who feel that the turbines would render the existing bridleway route unfeasible or inadvisable, weighs against the proposed development. Moreover, whether using the proposed permissive bridleway sections or not, riders using the rights of way hereabouts would find their experience and enjoyment of the landscape heavily altered, and in my view compromised, by the presence of the turbines.

For bridleway users passing between Lower House and Pentre Tump ridge there would be inconvenience and disruption to normal usage of the right of way during the development construction phase. This would manifest itself first in the enforced use of the proposed temporary diversion; in addition, the initial bridleway length from the A44 would evidently be shared with construction traffic during this period. Second, even though bridleway users would be segregated from the line of the new access road during the construction phase, there would plainly be disturbance and loss of amenity for bridleway users, from the nearby physical construction of the new track up the hillside and then from the track’s use by turbine construction traffic. I accept that these effects would be short-term. However, and longer-term, the physical changes to landform and surface arising from the construction of the new site access road would alter radically the bridleway experience for users of routes 1249/1248 following the construction phase. These adverse effects, whilst not determinative by themselves, weigh in the balance against the proposal.

Whilst I accept that the provisions of the unilateral obligation provide a technically workable solution to bridleway access issues, I nonetheless consider that the new arrangements put forward would represent a poorer state of affairs for users of this significant part of the bridleway network. The financial provisions for signage and other rights of way improvements and the undertaking to provide if required a permissive path people to pass closer to the turbines if they wish are not matters, in my view, which adequately offset the harmful effects I have identified. Overall, I consider that the provisions of the unilateral undertaking do not overcome the harm to amenity which would result from the proposed development. Moreover, the fact that such extensive measures are put forward in an attempt to provide mitigation only emphasises the significant discord between the scheme’s characteristics and the pattern and nature of recreational activity and enjoyment of the landscape which takes place. …

Having considered all matters raised, I conclude that the appeal should be dismissed.

Alwyn B Nixon
Inspector

Download original document: “Pentre Tump Appeal Dismissed

This material is the work of the author(s) indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this material resides with the author(s). As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Queries e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky