Categories

ALERTS HOME
Archives

  • April 2024
  • January 2024
  • October 2023
  • March 2023
  • October 2022
  • July 2022
  • ALL
    RSS

    Add NWW Alerts to your site (click here)

    Get weekly updates

    WHAT TO DO
    when your community is targeted

    RSS

    RSS feeds and more

    Keep Wind Watch online and independent!

    Donate via Stripe

    Donate via Paypal

    News Watch

    Selected Documents

    All Documents

    Research Links

    Press Releases

    FAQs

    Campaign Material

    Photos & Graphics

    Videos

    Allied Groups

    Wind Watch is a registered educational charity, founded in 2005.

    Source:  Wisconsin Global Warming Task Force Work Group:

    Reform of siting process for wind projects under 100 MW 

    Source:  Wisconsin Global Warming Task Force Work Group: | Action alerts, Wisconsin

    Comments due by Dec. 8! Click here

    In Wisconsin, local governments can prevent an energy development only on health and safety grounds. This “reform” would take away that right. In addition, this “reform” proposes easing any remaining burden on the developer.

    “7. Specific Description of Policy Proposal: Legislation would contain the following elements: (1) definitions of large and small wind energy systems; (2) a requirement on the PSC to draft uniform standards for siting large and small wind energy systems; (3) creation of an optional process for PSC review of projects under 100 MW that have large wind energy systems; (4) a mechanism for allowing parties to appeal a decision rendered by a local jurisdiction to the PSC; (5) extending Chapter 227 judicial review provisions to wind projects permitted by local jurisdictions, including the ability to appeal a decision under 100 MW; and (6) a prohibition on local ordinances restricting meteorological test towers. These provisions would essentially require the PSC to promulgate standards for local review, such as setback distances and sound output, and apply them to both agency-reviewed projects as well as those reviewed by local land use authorities.

    “The new rules adopted by the Commission for wind projects under 100 MW would be less rigorous than what is required under the CPCN process. The developer should not be required to demonstrate need, nor should the developer be required to present an alternative site as part of the permit application.

    “8. Timetables, Duration and Stringency Option: Once the legislation is enacted, the PSC would have a specified period of time to adopt emergency rules establishing uniform standards for permitting wind projects. These standards would apply to PSC-reviewed wind projects as well as those reviewed by local jurisdictions. These rules would remain in effect indefinitely.

    … Today, at least 400 MW of wind projects currently under development are subject to local restrictions [e.g., wind ordinances in Manitowoc, Door and Shawano counties and the Town of Stockbridge (Calumet County) and the moratoria in Calumet and Trempealeau counties and the Town of Glenmore (Brown County)] that prevent them from going forward.

    Download “Wisconsin Wind Siting Reform”

    Wind Watch relies entirely
    on User Funding
       Donate via Stripe
    (via Stripe)
    Donate via Paypal
    (via Paypal)

    Share:

    e-mail X FB LI M TG TS G Share

    Get the Facts
    CONTACT DONATE PRIVACY ABOUT SEARCH
    © National Wind Watch, Inc.
    Use of copyrighted material adheres to Fair Use.
    "Wind Watch" is a registered trademark.

     Follow:

    Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

    Wind Watch on Mastodon Wind Watch on Truth Social

    Wind Watch on Gab Wind Watch on Bluesky